We can detect and pin point the problem using leak detection technology such as Thermal Imaging, Acoustic testing and Tracer gas equipment. We can then dig the spot, make the repair, make good and restore your supply quickly and efficiently.
ITEM | ADDITIONALS | |
---|---|---|
Spot Dig first 1m length up to 1m depth | ||
Grass | Price includes Sand, cement, ballast, 25mm MDPE PIPE. | |
Slabs | 2 Fittings,2 inserts, bedding, backfill, waste disposal, | |
Block paving | CAT scan, boards and barriers. This is flexible. | |
Concrete - 100mm | ||
Reinforced concrete | ||
Tarmac (cold lay only) | ||
Per extra meter spot dig | ||
Grass | Includes Sand, cement, ballast, 25mm MDPE PIPE. | |
Slabs | 2 Fittings,2 inserts, bedding, backfill, waste disposal, | |
Block paving | CAT scan, boards and barriers. This is flexible. | |
Concrete - 100mm | ||
Reinforced concrete | ||
Tarmac (cold lay only) | ||
Moling up to 10m length | ||
Grass | Price includes launch and reception pits. Sand, cement, ballast, 25mm MDPE PIPE. | |
Slabs | 2 Fittings, 2 inserts, bedding, backfill, waste disposal, | |
Block paving | CAT scan, boards and barriers. This is flexible. | |
Concrete - 100mm | ||
Reinforced concrete | ||
Tarmac (cold lay only) | ||
Misc item | Awkward connection, steps, not standard. | |
Extra meter mole after 10m | ||
2nd reception pit (over 10m) |